We build thousands of fabrications per year from simple sanitary spool pieces, jacketed fittings, sanitary manifolds to complete pre-fabricated sanitary piping systems to turn key skids and modules.
February 17, 2014
Sanitary stainless steel manifolds are used throughout the hygienic process industry. We see them all of the time in filling/dispensing […]
May 1, 2012
We have the facilities, equipment and personnel to make Factory Acceptance Testing efficient and productive. A successful FAT is a rewarding end to any challenging project.
April 18, 2012
In today’s economic times, manufactures are rationalizing their product lines, often eliminating many legacy products. This means niche, specialty products […]
April 3, 2012
At Holland we specialize in fabrication of custom sanitary components. Our facility is a ‘stainless steel or higher alloy only” […]
February 8, 2012
Holland Engineers developed a removable decking insert to accommodate any vessel diameter per position on each array. The Module Deck Showing the Inserts That Will Accommodate Multiple Vessel Sizes sections were designed to be easily and safely removed and reinstalled for reconfiguration
January 28, 2012
Holland fabricated a set of reverse acting, spring loaded, stainless steel pliers with a custom hook device, with removable silicone inserts so that the pliers will not scratch or damage the vials while they are being moved from one piece of equipment to another
October 12, 2011
Holland has been designing and building custom processing systems and skid’s for over 40 years. Whether you need a simple […]
September 9, 2011
Holland’s sanitary stainless steel fabrication shop did all the fabrication to modify the valves ahead of time and they were dropped in during a short shutdown. The customer was retrofitted with new valves, up and running without any impact on the production schedule and at a significant cost savings over field piping.
November 30, 2009
The order was placed and valves pulled from in house stock ITT diaphragm valves to be ported and mechanically polished in house at Holland. The ITT valves were electropolished, passivated and delivered to the customer within four days.